Putting your brand on the pack is routine for us. The delays, when they happen, are almost always about artwork and declarations rather than the rice.
What to send
- Print-ready artwork, with fonts outlined and a 3 mm bleed
- Your barcode, as a vector, not a screenshot
- The declarations your market requires — nutrition panel, importer details, language requirements
- Pack sizes and the material you want: BOPP, PET-poly or jute
What comes back
A print proof, before anything goes on press. Nothing is printed until you have signed it off. The first run adds seven to ten days for repro and plates; repeat orders do not.